FRA5
Works on the FRA5 project currently include a comprehensive fit-out package, incorporating drylining, mesh installations, doors (internal and external), RAF, structural ceilings and steel, chase walls and roller doors. The scope also covers tiling, sanitaryware, carpet, vinyl and ceiling finishes, all delivered to the high standards of quality, safety and technical compliance required for the facility.
-
Location
FRANKFURT, GERMANY -
commencement date
OCTOBER 2024 -
Client
MERCURY -
DATA CENTRE
PROJECT INFO
The FRA5 project involves the delivery of a comprehensive internal and structural fit-out package, encompassing a wide range of specialist trades and finishes. Errigal’s scope includes extensive drylining works, mesh installations, chase walls and the installation of both internal and external doors, including roller shutter doors. The project also incorporates RAF, structural ceilings and structural steel elements, forming key components of the building’s core infrastructure.
In addition to the primary construction works, the package includes high-quality finishing elements such as tiling, sanitaryware installation, carpet and vinyl flooring, and suspended ceiling systems. Each aspect of the works is being delivered in line with stringent quality, safety and technical standards, ensuring a coordinated and compliant finish that meets the operational requirements of the FRA5 facility.