>Projects FRA 31
FRA 31

Works on the FRA 31 project currently include a full CSA fit-out of the data halls and administrative areas, executed to the high standards of quality, safety, and technical compliance required for a data centre facility.

PROJECT INFO

Works on the FRA 31 project currently comprise the delivery of a comprehensive CSA fit-out to the data halls and associated administrative areas. The scope includes the coordinated installation of structural, architectural, and internal finishes, specifically drylining, internal and external doors, structural ceilings, suspended ceilings, tiling, sanitaryware, carpet, and vinyl flooring. All works are executed to the high standards required of a mission-critical environment, with a strong emphasis on quality, safety, durability, precision, and interface coordination to ensure long-term operational performance and resilience of the facility.