BER 11/13/14/21
The scope includes firestopping, secondary steel, security and roller doors, mesh walls and screens, logistics, drywall partitions, tiling, structural and lightweight ceilings, glazed screens, acoustic treatments, and whitewall panels.
-
Location Berlin, Germany
-
DATA CENTRE -
Client
MERCURY ENGINEERING
PROJECT INFO
The scope of works comprises a comprehensive range of services and installations. This includes the installation of firestopping systems to ensure full compliance with fire safety regulations, along with secondary steel structures to support various architectural and functional elements. The package also covers the supply and fitting of security and roller doors, mesh walls, and protective screens. Additional works involve full logistics support, drywall partitioning, and high-quality wall and floor tiling. Both structural and lightweight ceiling systems are included, as well as the installation of glazed screens, acoustic treatment packages for noise control, and hygienic whitewall panel systems throughout designated areas.